ASTM E331 PDF

The ASTM E testing is performed by applying water to the exterior of the test specimen while lowering the pressure inside by means of an air chamber built on the inside or opposite side of the test specimen. The water spray system has nozzles spaced on a grid to deliver water so that the test specimen is wet uniformly, includingthose areas vulnerable to water penetration. The calibrated spray apparatus spray-rack system delivers water to the test specimen at a rate of 5. The testing pressure differential is usually determined by the testing specifier. Most generic specifications call for a minimum testing pressure of 6. BDG utilizes professional testing equipment that is calibrated to each specific testing standard for accurate results.

Author:Galar Ganos
Country:Madagascar
Language:English (Spanish)
Genre:Life
Published (Last):22 September 2016
Pages:270
PDF File Size:14.16 Mb
ePub File Size:16.17 Mb
ISBN:776-7-75245-768-4
Downloads:52104
Price:Free* [*Free Regsitration Required]
Uploader:Vudokinos



More E The air-pressure differences acting across a building envelope vary greatly. These factors should be fully considered prior to specifying the test pressure difference to be used. In service, the performance will also depend on the rigidity of supporting construction and on the resistance of components to deterioration by various causes, vibration, thermal expansion and contraction, etc. It is difficult to simulate the identical complex wetting conditions that can be encountered in service, with large wind-blown water drops, increasing water drop impact pressures with increasing wind velocity, and lateral or upward moving air and water.

Some designs are more sensitive than others to this upward moving water. Scope 1. Water that penetrates the assembly, but does not result in a failure as defined herein, may have adverse effects on the performance of contained materials such as sealants and insulating or laminated glass. This test method does not address these issues. The values given in parentheses are mathematical conversions to inch-pound units that are provided for information only and are not considered standard.

It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. For specific hazard statements, see 7.

CASO CLINICO DE TRIPANOSOMIASIS AFRICANA PDF

Differences between ASTM E331 & ASTM E1105

Keeping water out of wall assemblies is crucial for the long-term health of buildings and their occupants. Contact an air barrier specialist today Intended to simulate a realistic scenario, the test requires the construction of a specimen wall with all components to be tested at full size using the same details as in an actual wall assembly. This could include an air barrier or water-resistive barrier as part of the assembly. The specimen is installed on one side of a sealed test chamber, which is equipped with a water spray grid with nozzles that spray water on the specimen uniformly at a minimum rate of 3.

LUIGI ZINGALES MANIFESTO CAPITALISTA PDF

ASTM E 331 and ASTM E 1105: Testing Water Resistance of Exterior Walls

.

Related Articles